New chat

Anonymous

How to configure VC in SAP

SAP Config Pro logo
SAP Config Pro

Configuring Variant Configuration (VC) in SAP involves several steps to effectively manage complex product structures with many variants. Here's a step-by-step guide:

  1. Defining Characteristics:

    • Characteristics in SAP VC are used to define the properties of a product.
    • Go to Transaction Code (TCode) CT04 - Create Characteristic. Here, define the characteristics, like size, color, material, etc., that describe the variants of the product.
  2. Creating Class:

    • Classes are used to group these characteristics.
    • Use TCode CL02 - Create Class. Choose class type 300 for variant configuration. Assign the characteristics you created to this class.
  3. Creating Configurable Material:

    • You need to create a material that will be configurable.
    • In TCode MM01 - Create Material, create a new material and assign the class you created to it. Ensure the material type is configurable (often KMAT).
  4. Configuring Bill of Material (BOM):

    • The Bill of Materials for a configurable product includes all possible components.
    • Use TCode CS01 - Create BOM. For each BOM item, you can specify dependencies to determine under what conditions each component is needed.
  5. Defining Dependency:

    • Dependencies control how different characteristics relate to each other and to the BOM components.
    • TCode CU01 - Create Dependency allows you to create dependencies. There are different types like preconditions, selection conditions, and actions.
  6. Creating Configuration Profile:

    • A configuration profile is needed for each configurable material.
    • Use TCode CU41 - Create Configuration Profile. Here, assign the configurable material and define how the configuration process should happen.
  7. Testing Configuration:

    • Test the configured product to ensure that all characteristics, classes, and dependencies are working as expected.
    • Use TCode VA01 - Create Sales Order and try to configure the product as per different variant combinations.
  8. Additional Information:

    • Ensure that pricing conditions are set up to handle different variants.
    • Check if all integration points with other modules like Production Planning (PP) and Materials Management (MM) are configured correctly.

Summary Table:

StepTaskTCodeNotes
1Define CharacteristicsCT04Define properties of product variants
2Create ClassCL02Use class type 300 for VC
3Create Configurable MaterialMM01Assign the created class, use KMAT type
4Configure BOMCS01Specify dependencies for BOM items
5Define DependencyCU01Create preconditions, selection conditions, etc.
6Create Configuration ProfileCU41Assign configurable material
7Test ConfigurationVA01Test product configuration in a sales order
8Additional Setup-Ensure pricing and module integrations

This guide provides a general path for setting up Variant Configuration in SAP. Depending on the specific business scenario, additional steps or different configurations might be required.